- Prime and paint living room.
- Prime and paint main entrance.
- Prime and paint formal living room.
- Drywall garage
- Replace garage door motors.
- Squirrel proof attic prior to winter.
- Finish Master Bedroom Closet.
- Install recessed Medicine Cabinet in Master Bathroom.
- Paint Garage Floor with Quikrete Garage Floor Coating.
- Install Garage Cabinets.
- Re-seed yard in spots.
- Replace attic pull down steps.
- Eventually replace carpet in Dining Room and Formal Living Room.
I know is seems like a lot to do, but the delay is mostly on the funding for the projects I have listed above. I need to learn to not go into Lowe's and spend more than I really need.
No comments:
Post a Comment